Project References

Mid Field Terminal
Mid Field Terminal
NOVEMBER 6, 2015 BY NORTHERN ENGINEERING SURVEYS L.L.C DUBAI
Project Mid Field Terminal
Scope of the work Construction survey
Client Abudhabi Airport Company
Main Contractor TAV, CCC, ARABTEC JV
Consultant KPF / AECOF
Al Raha Beach Development
Al Raha Beach
NOVEMBER 6, 2015 BY NORTHERN ENGINEERING SURVEYS L.L.C DUBAI
Project Al Raha Beach Development
Scope of the work Construction survey
Main Contractor Murray & Robert’s & Ghantoot group
Consultant Blaire Anderson
Al Salam Street Tunnel Project
Al Salam Street
NOVEMBER 6, 2015 BY NORTHERN ENGINEERING SURVEYS L.L.C DUBAI
Project Al Salam Street Tunnel Project
Scope of the work Land Survey, leveling and topographical survey
Main Contractor Samsung – Saif Darwish – JV
Consultant PHARSON
Works done Setting out of center lines Setting out of Grid lines marking Leveling and Alignment of Columns and beams
ADIC Tower
ADIC Tower
NOVEMBER 7, 2015 BY NORTHERN ENGINEERING SURVEYS L.L.C DUBAI
Project ADIC Tower
Scope of the work Land Survey, leveling and topographical survey
Main Contractor WILLIAM HARE UAE L.L.C
Consultant DIAR
Works done Setting out of center lines Setting out of Grid lines marking Leveling and Alignment of Columns and beams
Dubai Metro
Dubai Metro
OCTOBER 5, 2015 BY NORTHERN ENGINEERING SURVEYS L.L.C DUBAI
ProjectDubai Metro
Scope of the workA complete construction survey and viaducts
ClientRoad Transport Authority, Dubai
Main ContractorJT METRO (Turkey and Japanese association)
ConsultantSYSTRA Engineering
Works doneEstablishing control stations, Benchmark, Topographical survey, Producing drawings, Take out for cut and fill of earthworks, taking the survey details for different sections etc.,
Burj Dubai Tower
Burj Dubai Tower
OCTOBER 4, 2015 BY NORTHERN ENGINEERING SURVEYS L.L.C DUBAI
ProjectBurj Dubai Tower
Scope of the workSurvey work for Raft Foundation
ClientEmaar
Main ContractorSAMSUNG& ARABTEC
ConsultantHyder Consulting
Works donePreliminary setup of site control network applying the best fit for the raft foundation.
 
 
The Palm Jumeirah Projects
Palm Jumeirah Projects
OCTOBER 5, 2015 BY NORTHERN ENGINEERING SURVEYS L.L.C DUBAI
ProjectThe Palm Jumeirah Projects
Scope of the workTopographical survey
ClientAl Nakheel, Dubai
Main ContractorAl Naboodah
ConsultantAssociated Consulting Engineers, Dubai
Works doneEstablishing control station, Bench mark, Topographical survey, Producing Drawings, Take out for cut and fill of earthworks, Checking and recording of final grading levels, volume calculation , in Trunk area
Dubai Pearl Residence Tower
Dubai Pearl Residence Tower
OCTOBER 5, 2015 BY NORTHERN ENGINEERING SURVEYS L.L.C DUBAI
ProjectDubai Pearl Residence Tower C2 & C3
Scope of the workTopographical survey
ClientDubai Pearl Residence
Main ContractorSWISS BORING
ConsultantHyder Consultant Engineering
Works doneEstablishing control station, Bench mark, Topographical survey, Producing Drawing, Take out for cut and fill of earth works, Checking and recording of final grading levels, volume calculation, Grid line set up.
Dubai International Financial Center
International Financial Center
NOVEMBER 7, 2015 BY NORTHERN ENGINEERING SURVEYS L.L.C DUBAI
ProjectDubai International Financial Centre
Scope of the workRaft Foundation & run main vertical control point
ClientTaminiyat
Main ContractorDubai contracting company
ConsultantAtkins
Works doneEstablished all main control point for the positioning of raft foundation. run main vertical control point from DM benchmark to site location
Grosvenor House & Apartment
Grosvenor House
NOVEMBER 7, 2015 BY NORTHERN ENGINEERING SURVEYS L.L.C DUBAI
ProjectGrosvenor House & Apartment
Scope of the workRaft Foundation & run main vertical control point
ClientDubai Holding
Main ContractorSamsung
ConsultantHOK
Works doneEstablished all main control point for the positioning of raft foundation. run main vertical control point from DM benchmark to site location
Dubai Marina six Towers
Dubai Marina six Towers
NOVEMBER 7, 2015 BY NORTHERN ENGINEERING SURVEYS L.L.C DUBAI
ProjectDubai Marina six Towers
Scope of the workHead the survey team
ClientEmaar
Main ContractorArabtec
ConsultantW S Atkins
Works doneHeaded in accordance to the skewed angle relative to the North area. Control four survey parties including car park and podium of the South Area
Dubai Grand Hyatt Tower Complex
Hyatt Tower Complex
NOVEMBER 7, 2015 BY NORTHERN ENGINEERING SURVEYS L.L.C DUBAI
ProjectDubai Grand Hyatt Tower Complex
Scope of the workCoordinate total survey and produce drawings
ClientHyatt Hotel Corporation
Main ContractorDubai Contracting Company
ConsultantArchitectural Consulting Engineers
Works doneCoordinate the complete survey and preparation of all data to be set out for the four towers. Followed up drawing issuance as well as revision with the head engineering department.
 