Establishing control station, Bench mark, Topographical survey, Producing Drawing, Take out for cut and fill of earth works, Checking and recording of final grading levels, volume calculation, Grid line set up.
Project | Dubai Pearl Residence Tower C2 & C3 |
Scope of the work | Topographical survey |
Client | Dubai Pearl Residence |
Main Contractor | SWISS BORING |
Consultant | Hyder Consultant Engineering |
Works done | Establishing control station, Bench mark, Topographical survey, Producing Drawing, Take out for cut and fill of earth works, Checking and recording of final grading levels, volume calculation, Grid line set up. |
Copyright 2020, ACCURATE SURVEY WORKS L.L.C Abu Dhabi U.A.E, All Rights Reserve. Powered By: Northern Techno Soft (P) Ltd.