Lusail Development Primary Infrastructure – Qatar

Project Lusail Development Primary Infrastructure
Scope of the work CP 3A Ph 2 – Construction of Bridges 3,4,5,7,8 & 9 
Client Lusail Development Authority
Main Contractor Samsung Engineering
Consultant Qatar Diar
Works done Establishing control stations, Benchmark, Topographical survey, Producing Drawings, Take out for cut and fill of earthworks, Checking and recording of final grading levels, volume calculation, road and infrastructure survey work executed
post

Burj Dubai Tower

Project Burj Dubai Tower
Scope of the work Survey work for Raft Foundation
Client Emaar
Main Contractor SAMSUNG& ARABTEC
Consultant Hyder Consulting
Works done Preliminary setup of site control network applying the best fit for the raft foundation.
post

Marina Six Towers – Dubai

Project Dubai Marina Six Towers
Scope of the work Head the survey team
Client Emaar
Main Contractor Arabtec
Consultant W S Atkins
Works done Headed in accordance to the skewed angle relative to the North area. Control four survey parties including car park and podium of the South Area
post

Dubai Grand Hyatt Tower Complex

Project Dubai Grand Hyatt Tower Complex
Scope of the work Coordinate total survey and produce drawings
Client Hyatt Hotel Corporation
Main Contractor Dubai Contracting Company
Consultant Architectural Consulting Engineers
Works done Coordinate the complete survey and preparation of all data to be set out for the four towers. Followed up drawing issuance as well as revision with the head engineering department.
post

Dubai Marina six Towers

Project Dubai Marina six Towers
Scope of the work Head the survey team
Client Emaar
Main Contractor Arabtec
Consultant W S Atkins
Works done Headed in accordance to the skewed angle relative to the North area. Control four survey parties including car park and podium of the South Area